About Us

History

2016

New shares listed on the new three boards, the new film subsidiary was established.

2017

The second phase of the new film plant was completed, covering an area of 80 acres, with an annual output of 2 million square meters.

2018

Obtain the "Green Yang Jinfeng Plan" talent award; It has completely replaced foreign imports and has been successfully applied in many domestic sewage treatment projects.

2019

Obtained the Yangzhou Science and Technology Achievement Transformation Project; The introduction of "XS-MS" and "XS-T" series of membrane products and equipment has made a major breakthrough in the application of high-salt wastewater.

2020

Participate in the drafting and release of national standards for ceramic membrane plates for water treatment (GB/T39717-2020); Obtain the "Jiangsu Province domestic products related to drinking water hygiene and safety hygiene license approval"; Access to the provincial new product identification in Jiangsu Province.

2021

Won the title of "Yangzhou Intelligent Workshop; The new "integrated water treatment equipment based on large-size thin-walled hollow flat-plate ceramic membrane" was included in the recommend catalogue of industrial water-saving technology and equipment of the Ministry of Industry and Information Technology; It has become the main drafting unit of the group standard of "Leader" Standard Evaluation Requirements Ceramic Membrane Elements (T/ZGM 008-2021 T/CSTE0056-2021) of China Membrane Industry Association.
< 1 >